Once we cleared most of the trash, we were able to bring in equipment needed to tear down the old roof. Then we brought in the cranes so we can build the new roof.
part of the old roof that needed to be torn down a closer look at the old roof we kept the internal load-bearing beam scaffolding boarding up the garage door steel joists for the roof crane work hoisting up the joints carefully… very carefully… … … then the top chords of the joists are welded to the supporting structures. all lined up and welded the view from the ground attaching the rafters the view from the roof good work from these folks sealing work a week later… we have a roof!